Lightweight,
twist-free steel girder construction with low headroom.
The boom is fitted with a bearing and a wall bracket for
anchoring the crane to a concrete wall.
Mounting
a jib crane to a wall, in combination with a festooned cable
system, may lead to restrictions in the slewing range of
the boom. This being the case, slew stoppers (buffers) should
be fitted accordingly.
Mounting
- Wall mounting, using threaded rods that go through
the wall and that are bolted to the wall with counter
plates and nuts.
- Pillar embracing with anchor bolts and wall bracket.
Bracket plate max. 500 mm, anchor bolts (threaded rods)
max. 1000 mm.
- Alternative mounting systems upon request.
Option
- Slew stoppers (buffers) can be fitted on building site
for a pre-determined fixed slewing range.
- Slewing brake, to control the boom speed during slewing.
Recommended for a boom length of more than 5 m or a headroom
of more than 4 m. This prevents uncontrolled movement of
the boom. Increased paint layer (120 ?m) or hot-dip galvanisation
for outdoor use.
- Manual locking device, to hold the boom in a fixed position
(wind protection).
- Hoist cover for outdoor use.
Scope of delivery
- The electrical system is equipped with a lockable main
switch, round cable power supply with cable support pipes
for booms up to 4000 mm.
- From 4500 mm upwards, the boom is equipped with a festooned
cable power supply. Due to cable sag on low cranes, we recommend
the use of festooned cables even on short booms.
- Trolley stoppers at the front and at the back.
- Cranes are supplied with an operating manual and complete
manufacturer‘s documentation. |